MARC details
000 -LEADER |
fixed length control field |
04917nam a2200337 4500 |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20220901102012.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
211123b |||||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE |
Transcribing agency |
CvSU Main Campus Library |
041 0# - LANGUAGE CODE |
Language code of text/sound track or separate title |
eng |
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER |
Classification number |
631.7 |
Item number |
M37 2019 |
100 ## - MAIN ENTRY--PERSONAL NAME |
9 (RLIN) |
14530 |
Personal name |
Masiglat, Andresito Jr. F. |
Relator term |
author |
245 10 - TITLE STATEMENT |
Title |
Proposed design of irrigation facility for agricultural land water efficiency in Barangay TulayA and Tulay B Maragondon, Cavite / |
Statement of responsibility, etc. |
by Andresito F. Masiglat Jr. and Roperto T. Villapaz. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Indang, Cavite : |
Name of publisher, distributor, etc. |
Cavite State University- Main Campus, |
Date of publication, distribution, etc. |
2019. |
300 ## - PHYSICAL DESCRIPTION |
Extent |
xxi, 249 pages : |
Other physical details |
illustrations ; |
Dimensions |
28 cm. |
336 ## - CONTENT TYPE |
Source |
rdacontent |
Content type term |
text |
337 ## - MEDIA TYPE |
Source |
rdamedia |
Media type term |
unmediated |
338 ## - CARRIER TYPE |
Source |
rdacarrier |
Carrier type term |
volume |
500 ## - GENERAL NOTE |
General note |
Design Project (Bachelor of Science in Civil Engineering) Cavite State University. |
504 ## - BIBLIOGRAPHY, ETC. NOTE |
Bibliography, etc. note |
Includes bibliographical references. |
508 ## - CREATION/PRODUCTION CREDITS NOTE |
College and Department |
College of Engineering and Information Technology (CEIT), Department of Civil Engineering |
520 3# - SUMMARY, ETC. |
Summary, etc. |
MASIGLAT, ANDRESITO FR. F. and VILLAPAZ, ROPERTO T. Proposed Design .f Irrigation Facility for Agricultural Land Water Efficiency in Barangay Tulay A and Tulay B, Maragondon, Cavite. Undergraduate Design Project. Bachelor of Science in Civil Engineering, Cavite State University, Indang, Cavite. June 2019. Adviser: Engr. Renato B. Cubilla. <br/>The study was conducted from November 2018 to March 2019 at the College of Engineering and Information Technology, Cavite State University, Indang Cavite to provide a design of irrigation facility of agricultural land in Barangay Tulay A and Tulay B, Maragondon Cavite. Cavite province had a total land resource at 142,706 hectares, where in 49.38 % of the total land resources were agricultural land (7.446.53 hectares) and the remaining 50.704 % (72,239.47 hectares) belongs to non-agricultural land area. The study was provide a design and analysis of reinforced concrete diversion dam and canal networks at Brgy. Malibiclibic, General Emilio Aguinaldo, Province of Cavite that supports the agricultural land in the said site. The design specifically aimed to provide architectural and structural plan of the structure facility; design the diversion dam and its networks that will withstand against unexpected situation; provide the detailed cost estimate of the project and specification; lastly, to provide tarpaulin of the design diversion dtma to showcase the proposed project. <br/>The analysis of said diversion dam was started from the hydraulic design. The researchers assumed a height and computed the possible afflux elevation based on um flood condition that the researchers computed. The computed afflux elevation liras 6.20 m and it serves as the maximum height of water that may occur in the darn. The researchers analyze the hydraulic jump to compute the length of the downstream apron which was 14 m and determined the sizes of chute blocks, baffle blocks and end sill. The shape of the dam that the researchers adopt was trapezoidal and the proportioning of the section of the dam is based on calculation of the shape of the crest of ogee dam as stated on the methodology. <br/>The diversion dam included the design of stem, base, heel and toe with a total length of 24 m and height of 4.27 m as computed. While the canal networks for the agricultural land was divided into 4 sections having a total length of 3.515 km as calculated. <br/>The total projected estimate cost for the reinforced concrete diversion dam was <br/>₱ 9.501,610.81. While total estimated cost computed for concrete irrigation canal was ₱ 63, 359,971.81. The projected project total cost estimate for the whole irrigation facility was ₱72. 861,582.63.<br/>The conduct design project serves as practical application of the knowledge, ideas and design concept regarding structural and water resource engineering that the researchers learned inside the classroom. It enriched the researchers' skills regarding civil works estimate, preparation of architectural and structural plan, and design analysis of reinforced concrete dam. The study also enhanced the knowledge of the researchers in using engineering software such as AutoCAD, Sketch up Pro and Lumion. <br/>If the design of diversion dam was implemented, suitable cut-off must be considered during construction and should be according to standard, to minimize the failure oldie dam against sliding.<br/> |
541 ## - IMMEDIATE SOURCE OF ACQUISITION NOTE |
Method of acquisition |
Submitted to the University Library |
Date of acquisition |
August 11, 2019 |
Accession number |
DP-665 |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
9 (RLIN) |
3082 |
Topical term or geographic name entry element |
Irrigation |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
9 (RLIN) |
669 |
Topical term or geographic name entry element |
Civil engineering |
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN) |
9 (RLIN) |
1678 |
Course or Program |
Bachelor of Science in Civil Engineering |
700 ## - ADDED ENTRY--PERSONAL NAME |
9 (RLIN) |
14531 |
Personal name |
Villapaz, Roperto T. |
Relator term |
author |
700 ## - ADDED ENTRY--PERSONAL NAME |
9 (RLIN) |
2640 |
Personal name |
Cubilla, Renato B. |
Relator term |
adviser |
856 ## - ELECTRONIC LOCATION AND ACCESS |
Electronic File |
<a href="http://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=9e5e004482e8ab681c39e252c8e7ed4f">http://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=9e5e004482e8ab681c39e252c8e7ed4f</a> |
Link text |
Click here to view thesis abstract and table of contents |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
Dewey Decimal Classification |
Koha item type |
Theses / Manuscripts |