CvSU Snapshot : development of mobile application for gathering images of events and activities inside the Cavite State University Main - Campus / by Dexter L. Cometa.

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Indang, Cavite : 2018. Cavite State University- Main Campus,Description: xiv, 77 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s): DDC classification:
  • 005.1  C73 2018
Online resources: Production credits:
  • College of Economics, Management, and Development Studies (CEMDS)
Abstract: FRENCILLO, MENCH JHON and RAMOS, PAUL ALLEN G. Proposed Design of Counterforted Retaining wall along Amuntay River in Dasmarinas City, Cavite. Undergraduate Design Project. Bachelor of Science in Civil Engineering, Cavite State University, Indang, Cavite. May 2018. Adviser: Engr. Roslyn P. Perla. The study entitled "Proposed Design of Counterforted Retaining Wall along Amuntay River Dasmarinas City, Cavite" was conducted from October 2017 to May 2018 at Cavite State University. The main objective of the study was to design a counterforted retaining wall along Amuntay river that will maintain stability of soil and prevents flooding on the area and estimate the cost of a counterfort retaining wall. Interview of the residents and resource persons were conducted to know the current condition of the riverside. The length and exact location of the proposed reinforced concrete retaining wall were determined through surveying. Researches were also conducted to gather information for the analysis and design of counterforted retaining wall. The design and analysis of counterforted retaining wall along Amuntay river Dasmarinas City, Cavite has an overall span of 240 meters. The design of base, stem, heel, toe and counterfort of counterforted retaining wall was considered in the study. Three types of retaining wall designs were made, design no. 1 with a height of 8.00 in, design no. 2 with a height of 7.50 in and design no. 3 with a height of 7 m xii height of 7.00 in. The total estimated cost for counterforted retaining wall design 1, counterforted retaining wall design 2 and counterforted retaining wall design 3 was P9,599,501.21 P14,240,826.58, and P respectively. The overall total estimated cost for the three proposed designs of counterforted retaining wall was Php 7 339 190.96. A detailed analysis of the design guidelines, procedure and specifications was applied in the study. The parameters used were carefully studied and detailed as to arrive to an efficient and effective design. In the design and analysis of counterforted retaining wall, ultimate strength design was used. Detailed structural drawings, structural design, detailed surveying, design specification and detailed estimates were included in the study. A tarpaulin which contains the illustration of the physical appearance of the proposed counterforted retaining wall was then provided and presented after the completion of the analysis and design process.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Materials specified URL Status Notes Date due Barcode
Theses / Manuscripts Theses / Manuscripts Ladislao N. Diwa Memorial Library Theses Section Non-fiction 005.1 C73 2018 (Browse shelf(Opens below)) Link to resource Room use only T-7704 00011873

Thesis (Bachelor of Science in Computer Science) Cavite State University

Includes bibliographical references.

College of Economics, Management, and Development Studies (CEMDS)

FRENCILLO, MENCH JHON and RAMOS, PAUL ALLEN G. Proposed Design of Counterforted Retaining wall along Amuntay River in Dasmarinas City, Cavite. Undergraduate Design Project. Bachelor of Science in Civil Engineering, Cavite State University, Indang, Cavite. May 2018. Adviser: Engr. Roslyn P. Perla.
The study entitled "Proposed Design of Counterforted Retaining Wall along Amuntay River Dasmarinas City, Cavite" was conducted from October 2017 to May 2018 at Cavite State University.
The main objective of the study was to design a counterforted retaining wall along Amuntay river that will maintain stability of soil and prevents flooding on the area and estimate the cost of a counterfort retaining wall.
Interview of the residents and resource persons were conducted to know the current condition of the riverside. The length and exact location of the proposed reinforced concrete retaining wall were determined through surveying. Researches were also conducted to gather information for the analysis and design of counterforted retaining wall.
The design and analysis of counterforted retaining wall along Amuntay river Dasmarinas City, Cavite has an overall span of 240 meters. The design of base, stem, heel, toe and counterfort of counterforted retaining wall was considered in the study. Three types of retaining wall designs were made, design no. 1 with a height of 8.00 in, design no. 2 with a height of 7.50 in and design no. 3 with a height of 7 m xii
height of 7.00 in. The total estimated cost for counterforted retaining wall design 1, counterforted retaining wall design 2 and counterforted retaining wall design 3 was
P9,599,501.21 P14,240,826.58, and P respectively. The overall total estimated cost for the three proposed designs of counterforted retaining wall was Php 7 339 190.96.
A detailed analysis of the design guidelines, procedure and specifications was applied in the study. The parameters used were carefully studied and detailed as to arrive to an efficient and effective design.
In the design and analysis of counterforted retaining wall, ultimate strength design was used. Detailed structural drawings, structural design, detailed surveying, design specification and detailed estimates were included in the study. A tarpaulin which contains the illustration of the physical appearance of the proposed counterforted retaining wall was then provided and presented after the completion of the analysis and design process.

Submitted copy to the University Library. 11/11/2018 T-7704

Copyright © 2023. Cavite State University | Koha 23.05