Accelerated bridge construction : best practices and techniques / by Mohiuddin Ali Khan
Material type: TextLanguage: English Publisher: Amsterdam ; Boston : Elsevier/BH, Butterworth-Heinemann is an imprint of Elsevier, [2015]Description: xiv, 584 pages ; illustrations : 24 cmContent type:- text
- unmediated
- volume
- 9780124072244
- TG300 K53 2015
Item type | Current library | Collection | Call number | Materials specified | Copy number | Status | Notes | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
Books | Ladislao N. Diwa Memorial Library Reserve Section | Non-fiction | RUS TG300 K53 2015 (Browse shelf(Opens below)) | Room use only | 76437 | 00076275 | |||
Books | Ladislao N. Diwa Memorial Library Circulation Section | Non-fiction | TG300 K53 2015 (Browse shelf(Opens below)) | c2 | Available | 75782 | 00076816 |
Browsing Ladislao N. Diwa Memorial Library shelves, Shelving location: Circulation Section, Collection: Non-fiction Close shelf browser (Hides shelf browser)
TD756.5 C76 1989 Constructed wetlands for wastewater treatment : municipal, industrial, and agricultural / | TD885.5 O3Sch1 1995 Earth algebra : college algebra with applications to environmental issues / | TD927 G48 1983 Village water supply in the decade : lessons from field experience / | TG300 K53 2015 Accelerated bridge construction : best practices and techniques / | TH145 P46 1996 Construction planning, equipment, and methods / | TH145 P46 1996 Construction planning, equipment, and methods / | TH146 Em6 2019 Barry's introduction to construction of buildings / |
Includes index.
Innovative construction methods -- Recent developments in ABC concepts -- Modular bridges.
The traveling public has no patience for prolonged, high-cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction costs. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe, and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes, and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption.
Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents
Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition
Covers design-build systems' boon to ABC; development of software; use of fiber-reinforced polymer (FRP)
Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum, and high-performance steel.
Fund 164 F&J de Jesus, Inc. Purchased April 23, 2018 76437 NEJ PHP 10,200.00 2018-02-0161 2018-1-0101
Fund 164 F & J de Jesus Purchased 01/18/2017 75782 10,200.00 copy 2