Design and analysis of steel footbridge in Manggahan, General Trias City, Cavite / by Kristel G. Gutierrez and Mark Andrew N. Vivero.

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Indang, Cavite : Cavite State University- Main Campus, 2019.Description: xviii, 233 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s): DDC classification:
  • 624.164  G98 2019
Online resources: Production credits:
  • College of Engineering and Information Technology (CEIT), Department of Civil Engineering
Abstract: GUTIERREZ, KRISTEL G., and NIVERO, MARK ANDREW N. Design and Analysis of Steel Footbridge in Manggahan, General Trias City, Cavite. Undergraduate Design Project. Bachelor of Science in Civil Engineering. Cavite State University. Indang, Cavite. June 2019. Adviser: Engr. Roslyn P. Pella The design project was conducted from August 2018 to April 2019. It was evaluated on April 2019 under the supervision of Engr. Roslyn P. Pena at the Department of Civil Engineering, College of Engineering and Information Technology, Cavite State University, Indang, Cavite. The study served as an application of the authors' gained knowledge and skills and an outlet to improve their potentials in designing structures. The study of the Proposed Design and Analysis of Steel Footbridge aimed to design a footbridge that could help to decongest the traffic and could also give pedestrians a safe way to cross Manggahan intersection without slowing down the traffic. Specifically. the design project aimed to: 1. provide architectural and structural plans; 2. perform structural analysis; 3. determine the estimated cost of the structures. The footbridge has a total length of 122 meters with 5 meters vertical clearance. It connects all sides of the intersections and has a four man lifts. The estimated cost of the footbridge is Php 16,198,667.36. National Structural Code of the Philippines (NSCP), American Institute of Steel Construction (AISC), Load Resistance and Factored Design (LRFD) and Department of Public Works and Highways Department Orders were used in determining the design standards for steel bridges. Structural Aided Analysis and Design, Sketchup and Computer Aided Drafting Device were used to have an accurate analysis on the structural members of the superstructure and to accomplish the architectural and structural details of the building. Upon the completion of the study, the authors recommended conducting a design and analysis for the proposed project using different materials like concrete or composite steel in order to determine which type of materials will be more economical.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Materials specified URL Status Notes Date due Barcode
Theses / Manuscripts Theses / Manuscripts Ladislao N. Diwa Memorial Library Theses Section Non-fiction 624.164 G98 2019 (Browse shelf(Opens below)) Link to resource Room use only DP-677 00079386

Design Project (Bachelor of Science in Civil Engineering) Cavite State University.

Includes bibliographical references.

College of Engineering and Information Technology (CEIT), Department of Civil Engineering

GUTIERREZ, KRISTEL G., and NIVERO, MARK ANDREW N. Design and Analysis of Steel Footbridge in Manggahan, General Trias City, Cavite. Undergraduate Design Project. Bachelor of Science in Civil Engineering. Cavite State University. Indang, Cavite. June 2019. Adviser: Engr. Roslyn P. Pella
The design project was conducted from August 2018 to April 2019. It was evaluated on April 2019 under the supervision of Engr. Roslyn P. Pena at the Department of Civil Engineering, College of Engineering and Information Technology, Cavite State University, Indang, Cavite. The study served as an application of the authors' gained knowledge and skills and an outlet to improve their potentials in designing structures. The study of the Proposed Design and Analysis of Steel Footbridge aimed to design a footbridge that could help to decongest the traffic and could also give pedestrians a safe way to cross Manggahan intersection without slowing down the traffic. Specifically. the design project aimed to: 1. provide architectural and structural plans; 2. perform structural analysis; 3. determine the estimated cost of the structures. The footbridge has a total length of 122 meters with 5 meters vertical clearance. It connects all sides of the intersections and has a four man lifts. The estimated cost of the footbridge is Php 16,198,667.36. National Structural Code of the Philippines (NSCP), American Institute of Steel Construction (AISC), Load Resistance and Factored Design (LRFD) and Department of Public Works and Highways Department Orders were used in determining the design standards for steel bridges.
Structural Aided Analysis and Design, Sketchup and Computer Aided Drafting Device were used to have an accurate analysis on the structural members of the superstructure and to accomplish the architectural and structural details of the building. Upon the completion of the study, the authors recommended conducting a design and analysis for the proposed project using different materials like concrete or composite steel in order to determine which type of materials will be more economical.

Submitted to the University Library September 05, 2019 DP-677

Copyright © 2023. Cavite State University | Koha 23.05