Aguilar, Monica Jane A.

A System study at Weltech Enterprise / by Monica Jane A. Aguilar, Lilian P. Francisco. - Indang, Cavite, Cavite State University- Main Campus, 2022. - xv, 97 pages : illustrations ; 28 cm.

Thesis (Bachelor of Science in Industrial Engineering) Cavite State University

College of Engineering and Information Technology (CEIT) College of Engineering and Information Technology (CEIT)

MONICA JANE A. AGUILAR, LILIAN P. FRANCISCO. A System study at Weltech
Enterprise. Undergraduate Thesis. Bachelor of Science in Industrial Engineering, Cavite
State University, Indang, Cavite. January 2022. Adviser: Ms. Dina P. Bawag.
The study was conducted to improve the current system at Weltech Enterprise in Silang,
Cavite, using different industrial engineering tools and techniques. Specifically, this study aimed
to: (1) determine the current system in the company's production; (2) identify the problems
encountered in the current system of their production; (3) analyze the root causes of the
identified problems; (4) provided possible solutions and recommendations to be implemented
for the improvement of their current system; and (5) assess and evaluate the stability of the
improvements in Weltech Enterprise after implementing solutions and recommendations.
As a result, researchers have successfully implemented the suggested solutions for the
improvement of the company. In Pareto analysis, researchers identified issues such as poor
facility layout, machine breakdown, poor inventory management, and poor priority rules. Using
the 80-20 rule, poor facility layout and machine breakdown had an 80 percent impact on the
firm. The fundamental cause of the problem was also identified using a fishbone diagram. To
understand the production process, flow process chart and operational process chart were
applied. Activity relationship diagram was used to establish an organized plant layout. A flow
diagram was also used to showcase the flow of the process in the production area.
Plant layout was also used for the continuous and little amount of work in progress. Also, overall
effectiveness equipment was used to identify the availability, performance and quality of each
machine.
With this, several improvements were formulated which help to increase the performance
and productivity of Weltech Enterprise. The time for the inspection was reduced for about 30
minutes since inspection was reduced by 6. In line with this,
flow process reduced by almost 77 minutes since the layout was transformed into a
U-shape assembly line for a smooth process. The overall equipment effectiveness (OEE) of
lathe, milling and grinding machine was improved by 3.23 percent, 2.16 percent, and 26.18
percent, respectively. As a result, the productivity increase by 1.18 and the production produced
106 pieces of manual stamping machine which clearly meets the demand of the client. Also,
when it comes to financial impact, it increased by P502,200.OO.
Lastly, researchers successfully implemented new operational process, flow process,
flow diagram, plant layout, and machine usage monitoring sheet. Based on the information given by the head operator in Weltech Enterprise the customers' demand was not in a rush
since the suggested solutions was used.


Production standards
Work standards