Proposed design of a four-storey administration and research center building in City of Imus Polytechnic Institute / by Renzo A. Navarro and Alyssa Bianca V. Romanes.

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Indang, Cavite: Cavite State University - Main Campus, 2018.Description: xxi, 279 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s): DDC classification:
  • 690  N22 2018
Online resources: Production credits:
  • College of Engineering and Information Technology (CEIT)
Abstract: NAVARRO, RENZO A. and ROMANES, ALYSSA BIANCA V. Proposed Design of a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute. Undergraduate Design Project. Bachelor of Science in Civil Engineering. Cavite State University, Indang, Cavite. June 2018. Adviser: Engr. Rico C. Asuncion. The study entitled "Proposed Design of a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute" was conducted at Cavite State University — Main Campus from October 2017 to April 2018. The general objective of the study was to design a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute. Specifically, the study aims to provide site development plan, architectural plans, and structural plans of the proposed structure, to provide a structural design of the structure, and to provide a detailed cost estimate to be used in the construction. The study aimed to provide a physical development plan and to design a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute. The lot area allotted for the design of the project 2,250.36 square meters and the floor area of the building 1,115 square meters. The total height of the project is 20.2 meters from the natural ground line to roof apex. The study included architectural and structural plan, electrical and plumbing layout. The architectural plan. structural plan, electrical and plumbing layout were drawn through Computer Aided Drafting Device (CADD) and Google Sketch Up software. The analysis of structural members was obtained with the aid of Structural Aided Analysis and Design (STAAD) software. Structural plan included the design of the purlins, sagrods, tie rods, truss, slabs, beams, columns and footings. The estimated cost of the proposed design project was P 58,174,390.00 having a cost of P 13,044.00 per square meter. The data gathered from the computations of the structural members of the proposed project were found safe and economical; and could be used for future implementation
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Materials specified URL Status Notes Date due Barcode
Theses / Manuscripts Theses / Manuscripts Ladislao N. Diwa Memorial Library Theses Section Non-fiction 690 N22 2018 (Browse shelf(Opens below)) Link to resource Room use only DP-546 00017671

Design Project (Bachelor of Science in Civil Engineering) Cavite State University

Includes bibliographical references

College of Engineering and Information Technology (CEIT)

NAVARRO, RENZO A. and ROMANES, ALYSSA BIANCA V. Proposed Design of a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute. Undergraduate Design Project. Bachelor of Science in Civil Engineering. Cavite State University, Indang, Cavite. June 2018. Adviser: Engr. Rico C. Asuncion.
The study entitled "Proposed Design of a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute" was conducted at Cavite State University — Main Campus from October 2017 to April 2018. The general objective of the study was to design a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute. Specifically, the study aims to provide site development plan, architectural plans, and structural plans of the proposed structure, to provide a structural design of the structure, and to provide a detailed cost estimate to be used in the construction. The study aimed to provide a physical development plan and to design a Four-Storey Administration and Research Center Building in City of Imus Polytechnic Institute. The lot area allotted for the design of the project 2,250.36 square meters and the floor area of the building 1,115 square meters. The total height of the project is 20.2 meters from the natural ground line to roof apex. The study included architectural and structural plan, electrical and plumbing layout. The architectural plan. structural plan, electrical and plumbing layout were drawn through Computer Aided Drafting Device (CADD) and Google Sketch Up software. The analysis of structural members was obtained with the aid of Structural Aided Analysis and Design (STAAD) software. Structural plan included the design of the purlins, sagrods, tie rods, truss, slabs, beams, columns and footings. The estimated cost of the proposed design project was P 58,174,390.00 having a cost of P 13,044.00 per square meter. The data gathered from the computations of the structural members of the proposed project were found safe and economical; and could be used for future implementation

Submitted to the University Library 01/28/2018 DP-546

Copyright © 2023. Cavite State University | Koha 23.05