Proposed stone masonry levee design with self-closing flood barrier in Balsahan Naic, Cavite / by Marvin B. Panganiban and Jeirol Eli C. Sarmiento.
Material type: TextLanguage: English Publication details: Indang, Cavite : Cavite State University- Main Campus, 2019.Description: xv, 95 pages : illustrations ; 28 cmContent type:- text
- unmediated
- volume
- 693.1 P19 2019
- College of Engineering and Information Technology (CEIT), Department of Civil Engineering
Item type | Current library | Collection | Call number | Materials specified | URL | Status | Notes | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
Theses / Manuscripts | Ladislao N. Diwa Memorial Library Theses Section | Non-fiction | 693.1 P19 2019 (Browse shelf(Opens below)) | Link to resource | Room use only | DP-732 | 00002453 |
Design Project (Bachelor of Science in Civil Engineering) Cavite State University.
Includes bibliographical references.
College of Engineering and Information Technology (CEIT), Department of Civil Engineering
PANGANIBAN, MARVIN B. and SARMIENTO, JEIROL ELI C. Proposed Stone Masonry Levee Design with Self-Closing Flood Barrier in Balsahan Naic, Cavite. Undergraduate Design Project. Bachelor of Science in Civil Engineering. Cavite State University Indang, Cavite. June 2019 Adviser: Engr. Cene M. Bago
The design project entitled “Proposed Stone Masonry Levee Design with Self-Closing Flood Barrier in Balsahan Naic, Cavite” conducted at Cavite State University - Main Campus from September 2018 to April 2019.
The study aimed to provide an efficient design of a levee and self-closing flood barrier to flood prone areas. The area was limited to Brgy. Balsahan Naic, Cavite. The total length of the area to design was 20 meters. The proposed design of levee has a self-closing flood barrier for the increasing floods.
The total height of the design of the levee was 6 meters in total. The authors concluded that the design of the flood control system is efficient and effective enough to withstand the critical level of flood and for the flood half meters higher than the self- closing flood barrier.
The total cost of the levee design with self-closing flood barrier was P 3,301,322.25 and the cost of the Self-Closing Flood barrier was depending to the height of the floodwater to be resisted. In our case P 2,781,920.
Submitted to the University Library 08/29/2019 DP-732