000 02743nam a2200313 a 4500
003 OSt
005 20230313092239.0
008 070518s19uu xx 00 eng d
040 _cCvSU Main Campus Library
041 0 _aeng
082 0 4 _a624.16
_bD56 2000
100 0 _aDigma, Joemar M.
_eauthor
_934058
245 1 0 _aInvestigation and improvement of sewerage system in Cavite State University (Phase II) /
_cby Joemar M. Digma.
260 0 _aIndang, Cavite :
_bCavite State University- Main Campus,
_c2000.
300 _a94 pages :
_cillustrations ;
_b28 cm.
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
500 _aDesign Project (BS Civil Engineering) Cavite State University.
504 _aIncludes bibliographical references.
508 _aCollege of Engineering, and Information Technology (CEIT)
520 3 _a DIGMA, JOEMAR MARQUITA, "Investigation and Improvement of Sewerage in Cavite State University (Phase Il)" Design Project, Bachelor of Science in Civil Engineering, Cavite State University, Indang Cavite, March 2000. Adviser: Engr. Cene Bago. This design project was conducted in Cavite State University (Phase Il) to investigate the existing sewerage and drainage in Cavite State University; provide proper design and recommendation for the improvement of the sewerage system; give an appropriate recommendation to enhance sanitary condition of the university; and to provide the estimated cost of the proposed design. The design project covered approximately 1.35 hectares. The design involves a storm sewer and sanitary sewer. Stom sewer design, facilitate the Physical Science, the Engineering and the whole Animal Science Department Area including the animal farm Cross Drain was installed with a 300 mm diameter pipe to avoid overflow on the road pavement. Pipe varied from 300 to 900 mm diameter, which was computed using the Rational Method. Sanitary sewer lines were installed generally in the whole area. A diameter of 200 mm diameter was used for the main line. There was a treatment plant installed in the area for treating wastes especially those from laboratory rooms. Estimate provides the total cost for materials and cost of labor. An increase in total price was deserved in using ATLANTA SPIRAL pipes over concrete pipes.
541 _cSubmitted copy for the University Library
_d03-27-2000
_eDP-19
650 0 _aCivil engineering
_9669
690 _91678
_aBachelor of Science in Civil Engineering
700 _aBago, Cene M.
_92474
_eadviser
856 _uhttp://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=00e92bbb7863c4087e5fdf3eafb9ddee
_yClick here to view thesis abstract and table of contents
942 _2ddc
_cMAN
999 _c379
_d379