000 04152nam a22003617a 4500
003 OSt
005 20240822145426.0
008 240408b |||||||| |||| 00| 0 eng d
040 _cCavite State University - Main Campus Library
041 0 _aeng
082 0 4 _a624.068
_bF69 2022
100 _aFojas, Raelyn F.
_943936
_eauthor
245 1 0 _aComparative study on change orders: causes and effects in public and private construction projects in Cavite during the COVID-19 pandemic /
_cby Raelyn F. Fojas and Bernadette H. Tumampil.
260 _aIndang, Cavite :
_bCavite State University- Main Campus,
_c2022.
300 _axxi, 158 pages :
_billustrations ;
_c28 cm.
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
500 _aCapstone Project (Bachelor of Science in Civil Engineering) Cavite State University.
504 _aIncludes bibliographical references.
508 _aCollege of Engineering and Information Technology (CEIT) Department of Civil Engineering.
520 3 _aFOJAS, RAELYN F., and TUMAMPIL, BERNADETTE H. Comparative study On Change Orders: Causes And Effects In Public And Private Construction Projects In Cavite During The Covid-19 Pandemic. Undergraduate capstone. Bachelor of Science in Civil Engineering. Cavite State University, Indang, Cavite. June 2022. Adviser : Engr. Renato B. Cubilla. The construction sector has this complex initiation, planning, execution, and performance, which emerges from the change of either work, budget, schedule, or addition or reduction in the initial plan. Despite having a precise plan from the start, changes can still be a challenge throughout the construction of a project. According to Khalifa W.M.A (2019), in a study entitled "Causes of Change Orders in Construction Projects," a Change Order is a written order to the contractor signed by the owner and then issued after accomplishment of the contract, permitting a change in the scope of work or any adjustment in the initial contract sum or initial contract time. In the Philippines, literature about Change Orders was considered to be trivial. This research study covers the comparison regarding change orders in the construction projects in Cavite. This research study aims to study and discuss the causes and effects of change orders in public and private construction projects in Cavite, determine the practices for change orders, and identify the differences based on the perception of the causes and effects of Change orders. And recommend an alternative course of action that will possibly reduce the issues related to Change Orders in Construction. Results from the study show that the most common causes of Change Orders in private and public construction projects in Cavite were Client related causes and External Factors. At the same time, the effects revolve around the Time-Schedule related effects and Expense related effects. Also, results show a significant difference in the perception of both the public and private sectors with the causes and effects of Change Orders. However, the second hypothesis is true that there is no significant difference in the perception of contractors, consultants, and clients regarding the causes and effects of Change Orders. This research study also provides a framework for managing change orders in construction projects. Keywords: Change Orders, Causes and Effects of Change Orders, Management Control Practices, Private Construction Projects, Public Construction Projects
541 _cSubmitted to the University Library
_dJanuary 18, 2023
_eCP-039
650 0 _aConstruction industry
_9920
650 0 _aConstruction projects
_9891
_xPublic
650 0 _aConstruction projects
_9891
_xPrivate
650 0 _aCOVID-19 Pandemic, 2020-
_934346
690 _aBachelor of Science in Civil Engineering
_91678
700 _aTumampil, Bernadette H.
_943937
_eauthor
700 _aCubilla, Renato B.
_92640
_eadviser
856 _yClick here to view the Abstract and Table of Contents
_uhttp://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=b38358e4f754b52064a3e1b992a15464
942 _2ddc
_cMAN
999 _c63563
_d63563