000 03247nam a2200337 a 4500
003 OSt
005 20221015150621.0
008 100818s19uu xx 00 eng d
040 _cCvSU Main Campus Library
041 0 _aeng
082 0 4 _a621.319
_bEr6 2010
100 0 _aEroles, Renen N.
_eauthor
_915379
245 1 0 _aDesign of an electrical distribution system for barangay Santa Mercedes Maragondon, Cavite /
_cby Renen N. Eroles and Nathaniel N. Pantoja.
260 0 _aIndang, Cavite :
_c2010.
_bCavite State University- Main Campus,
300 _axv, 137 pages :
_billustrations ;
_c28 cm.
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
500 _aDesign Project (BS Electrical Engineering) Cavite State University
504 _aIncludes bibliographical references.
508 _aCollege of Engineering and Information Technology (CEIT)
520 3 _a RENEN N. EROLES and NATHANIEL N. PANTOJA, Design of Electrical Distribution System for Barangay Santa Mercedes, Maragondon Cavite. Undergraduate Design Project. Bachelor of Sciene in Electrical Engineering.Cavite State University, Indang Cavite. April 2010. Adviser: Engr. Efren R. Rocillo. Barangay Santa Mercedes, Maragondon, Cavite, formerly Barangay Patungan, was located near the boundary of Cavite and Nasugbu, Batangas. The total number of population of the Barangay is 1505 and composed of 292 houses. The main source of living n the barangay is from the fishing industries. The barangay is only energized at night time from 6 pm to 10 pm. The power distribution was only connected to a 40 KVA generator set. cond The design of electrical distribution system for Barangay Santa Mercedes was ucted to have a basis for future electrification of the barangay. Having a longer and reliable supply of electricity in the place would make the residents more productive. Having this system the residence will have the privileged to have a cheaper but more efficient of electrical energy The total number of the households that could be serviced by the design if ted is 292. The projected additional of households in the next ten years is 147. The er of the transformers to be installed is 10. The size of primary and secondary to be used is 62500 CM and 250000 CM. The total number of poles to be 1 and the capacity of the substation to be installed for the barangay is 2250 total numb conductors installed is 5 The total load is 330.32 KVA and to be increased by 180.807 KVA in the next ten years. The initial cost in implementing the design is Php. 5,526,029. The total cost of the projected upgrading of the system for the next ten years is Php 2,584,818.99
541 _cSubmitted to the University Library
_d07/12/2010
_eDP-316
650 0 _aElectrification technology
_915381
650 0 _aElectrical distribution system
_915382
690 _92820
_aBachelor of Science in Electrical Engineering
700 _aPantoja, Nathaniel N.
_eauthor
_915380
700 _aRocillo, Efren R.
_eadviser
_92823
856 _uhttp://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=8ace1d4b0a7ae2cefba13c4c955e9ca2
_yClick here to view thesis abstract and table of contents
942 _2ddc
_cMAN
999 _c7919
_d7919