_aDesign of an electrical distribution system for barangay Santa Mercedes Maragondon, Cavite / _cby Renen N. Eroles and Nathaniel N. Pantoja. |
260 | 0 |
_aIndang, Cavite : _c2010. _bCavite State University- Main Campus, |
|
300 |
_axv, 137 pages : _billustrations ; _c28 cm. |
||
336 |
_2rdacontent _atext |
||
337 |
_2rdamedia _aunmediated |
||
338 |
_2rdacarrier _avolume |
||
500 | _aDesign Project (BS Electrical Engineering) Cavite State University | ||
504 | _aIncludes bibliographical references. | ||
508 | _aCollege of Engineering and Information Technology (CEIT) | ||
520 | 3 | _a RENEN N. EROLES and NATHANIEL N. PANTOJA, Design of Electrical Distribution System for Barangay Santa Mercedes, Maragondon Cavite. Undergraduate Design Project. Bachelor of Sciene in Electrical Engineering.Cavite State University, Indang Cavite. April 2010. Adviser: Engr. Efren R. Rocillo. Barangay Santa Mercedes, Maragondon, Cavite, formerly Barangay Patungan, was located near the boundary of Cavite and Nasugbu, Batangas. The total number of population of the Barangay is 1505 and composed of 292 houses. The main source of living n the barangay is from the fishing industries. The barangay is only energized at night time from 6 pm to 10 pm. The power distribution was only connected to a 40 KVA generator set. cond The design of electrical distribution system for Barangay Santa Mercedes was ucted to have a basis for future electrification of the barangay. Having a longer and reliable supply of electricity in the place would make the residents more productive. Having this system the residence will have the privileged to have a cheaper but more efficient of electrical energy The total number of the households that could be serviced by the design if ted is 292. The projected additional of households in the next ten years is 147. The er of the transformers to be installed is 10. The size of primary and secondary to be used is 62500 CM and 250000 CM. The total number of poles to be 1 and the capacity of the substation to be installed for the barangay is 2250 total numb conductors installed is 5 The total load is 330.32 KVA and to be increased by 180.807 KVA in the next ten years. The initial cost in implementing the design is Php. 5,526,029. The total cost of the projected upgrading of the system for the next ten years is Php 2,584,818.99 | |
541 |
_cSubmitted to the University Library _d07/12/2010 _eDP-316 |
||
650 | 0 |
_aElectrification technology _915381 |
|
650 | 0 |
_aElectrical distribution system _915382 |
|
690 |
_92820 _aBachelor of Science in Electrical Engineering |
||
700 |
_aPantoja, Nathaniel N. _eauthor _915380 |
||
700 |
_aRocillo, Efren R. _eadviser _92823 |
||
856 |
_uhttp://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=8ace1d4b0a7ae2cefba13c4c955e9ca2 _yClick here to view thesis abstract and table of contents |
||
942 |
_2ddc _cMAN |
||
999 |
_c7919 _d7919 |