000 04178nam a2200337 a 4500
003 OSt
005 20220110152848.0
008 051221s19uu xx 00 eng d
040 _cCvSU Main Campus Library
041 0 _aeng
082 0 4 _a629.8
_bF37 2014
100 0 _aFeranil, Marvin S.
_eauthor
_916626
245 1 0 _aComparative analysis of selected brewed coffee production in Cavite using methods engineering principles /
_cby Marvin S. Feranil.
260 0 _aIndang, Cavite,
_c2014.
_bCavite State University - Main Campus
300 _axix, 159 pages :
_billustrations ;
_c28 cm.
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
338 _2rdacarrier
_avolume
500 _aThesis (BS Industrial Engineering) Cavite State University
504 _aIncludes bibliographical references
508 _aCollege of Engineering and Information Technology (CEIT)
520 3 _aFERANIL, MARVIN S., OLIVAREZ ERLSON I. Comparative Analysis of Selected Brewed Coffee Production in Cavite Using Methods Engineering Principles.Undergraduate Thesis.Bachelor of Science in Industrial Engineering.Cavite State University, Indang, Cavite. April 2014. Adviser: Ms. Mary Joyce P. Alcazar. The study was conducted at Coffee Processing Unit at Cavite State University. Indang, Cavite; Cafe Amadeo at Brgy. Dagatan, Amadeo, Cavite and Cafe Belardo at Brgy. Loma, Amadeo, Cavite from November 2012 to February 2014 to compare selected brewed coffee production in Cavite using methods engineering principles. Specifically the study aimed to: 1. determine the actual operations in selected coffee production in the province of Cavite; 2. determine the problems encountered in the selected coffee productions; 3.apply the methods engineering principles for the evaluation of selected coffee productions: 4. determine the possible alternative solutions for the processes of selected coffee productions; and 5. recommend or suggest ways to improve the productivity of selected coffee productions. Data were gathered through actual observation of the process time, materials. machines, workers and plant layout. While analysis was done using different Methods engineering principles such as pareto analysis, fishbone diagram, time study, flow process chart, flow diagram, synchronous servicing, line balancing and plant layout. Using Pareto analysis, the study found out that the major problem encountered in the Coffee Process Center was the delay on production time; in Café Amadeo was the uncomfortable workplace; and, in Café Belardo was the poor workstation. All these were illustrated using the fishbone diagram. Using the time study method, results revealed that Coffee Processing Center had the most efficient hulling process (7.9 min) and manual sorting process (171 min). On the other hand. Café Belardo had the most efficient process for grinding (8.1 min), weighing/packaging (0.4 min) and sealing process (0.1 min) respectively. Using the flow process chart, results revealed that among the three coffee productions, Café Amadeo had the most efficient flow of materials for all the coffee production processes. Using the line balancing, the study found out that Coffee Processing Center produced more outputs per day with 616 units per day with two (2) operators only, compared Cafe Amadeo which produced 376 units per day and Café Belardo which produced 352 units per day. The study generally recommends that the three coffee productions should develop new plant layout to have a better flow in their production in terms of minimizing distances and walking time for every operation.
541 _cSubmitted to the University Library
_d04/24/2014
_eT-5308
650 0 _aProcess control
_xData processing.
_9967
650 0 _aDigital control systems
_xCoffee.
_91205
690 _91858
_aBachelor of Science in Industrial Engineering
700 _aOlivarez, Earlson I.Olivarez, Earlson I.
_eauthor
_916627
700 _aAlcazar, Mary Joyce P.
_eadviser
_92291
856 _uhttp://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=2b9ec2548a43e5e35ef2e1dca6aa5063
_yClick here to view thesis abstract and table of content
942 _2ddc
_cMAN
999 _c8768
_d8768