A Study of delays and risk responses development of construction project in CvSU Satellite Campuses during COVID-19 pandemic / (Record no. 63595)

MARC details
000 -LEADER
fixed length control field 04504nam a22003617a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240828091058.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240413b |||||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Transcribing agency Cavite State University - Main Campus Library
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.404
Item number Ar3 2022
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Arenas, Andrei L.
9 (RLIN) 44092
Relator term author
245 10 - TITLE STATEMENT
Title A Study of delays and risk responses development of construction project in CvSU Satellite Campuses during COVID-19 pandemic /
Statement of responsibility, etc. by Andrei L. Arenas and Elbert R. Tolentino.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Indang, Cavite :
Name of publisher, distributor, etc. Cavite State University- Main Campus,
Date of publication, distribution, etc. 2022.
300 ## - PHYSICAL DESCRIPTION
Extent xvi, 64 pages :
Other physical details illustrations ;
Dimensions 28 cm.
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
500 ## - GENERAL NOTE
General note Capstone Project (Bachelor of Science in Civil Engineering) Cavite State University.
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references.
508 ## - CREATION/PRODUCTION CREDITS NOTE
College and Department College of Engineering and Information Technology (CEIT) Department of Civil Engineering.
520 3# - SUMMARY, ETC.
Summary, etc. ARENAS ANDREI L., and TOLENTINO, ELBERT R. A study of Delays and Risk responses development of construction project in CvSU Satellite Campuses during Covid-19 Pandemic Undergraduate capstone. Bachelor of Science in Civil Engineering. Cavite State University, Indang, Cavite. June 2022. Adviser: Engr. Rachel June D. Samarita<br/>The study was conducted to identify the effects of delays and to determine the risk response to the development of construction projects in Cavite State University Satellite Campuses during the Covid -19 Pandemic. Specifically, to determine the changes to the project's schedule and budget due to the pandemic; identify the potential risk in the construction project during the pandemic; Determine the project management system used by the project team to lessen the impacts of delays and the risk on construction projects in the university.<br/>Data were collected in 4 satellite campuses of Cavite State University mainly in Carmona, Naic, Trece, and Imus. The project team was given a questionnaire or a google form to gather information.<br/>In 4 satellite campuses of Cavite State University that were surveyed, the insufficient labor force was shown to be the major factor that affects the project completion. In addition, the main risk that was present in the construction operation was the danger in site and health safety. The strategic plan that were imposed for the site and health safety is having health screening and cleaning. For the financial risk, having a clear communication with the owner or contractor is done. Furthermore, in the labor shonages deploying the right skilled employee is one of the ways to resolve the limitation in employees. Working closely with existing suppliers is the vital strategy in terms of solving the disruption in supply chain.<br/>The STAR building in Carmona campus, shown to have the highest percentage of time extension and cost overrun in their operation. Data shown that<br/>the reasons for the time extension and cost overruns of the project are due to their shortage of work force, shortages in supply, environmental factors, insufficient budget, increase in price and miscommunication.<br/>Strategies were made to lessen the delay in construction such as maximizing the work force and resources available, motivating by giving incentives to the employees and focusing on health and safety management. In addition, methods such as scheduling of materials, creating risk management plan and careful project scheduling is done to mitigate delays in construction.The researchers recommend conducting personal interviews in gathering data in order to have in depth information in knowing the risk and factors for the delay and risk in construction operations. Moreover, focusing on one issue could developed more insights to mitigate issues in construction industry<br/>
541 ## - IMMEDIATE SOURCE OF ACQUISITION NOTE
Method of acquisition Submitted to the University Library
Date of acquisition January 18, 2023
Accession number CP-061
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction industry
9 (RLIN) 920
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction projects
9 (RLIN) 891
General subdivision Delays
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction projects
9 (RLIN) 891
General subdivision Risk management
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element COVID-19 Pandemic, 2020-
9 (RLIN) 34346
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Course or Program Bachelor of Science in Civil Engineering
9 (RLIN) 1678
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Tolentino, Elbert R.
9 (RLIN) 44093
Relator term author
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Samarita, Rachel June B.
9 (RLIN) 22490
Relator term adviser
856 ## - ELECTRONIC LOCATION AND ACCESS
Link text Click here to view the Abstract and Table of Contents
Electronic File <a href="http://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=d42b384a2683d80e982c505eeb714f5a">http://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=d42b384a2683d80e982c505eeb714f5a</a>
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Theses / Manuscripts
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Source of acquisition Coded location qualifier Inventory number Total Checkouts Full call number Barcode Date last seen Uniform Resource Identifier Price effective from Koha item type Public note
    Dewey Decimal Classification   Room use only Non-fiction Ladislao N. Diwa Memorial Library Ladislao N. Diwa Memorial Library Theses Section 01/18/2023 Submitted to the university library. CP 600   658.404 Ar3 2022 00084098 04/13/2024 http://library.cvsu.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=d42b384a2683d80e982c505eeb714f5a 04/13/2024 Theses / Manuscripts CP-061
Copyright © 2024. Cavite State University | Koha 23.05