Design of a reinforced concrete foot-bridge across Salusoy Creek II at engineering complex / by Reandres R. Patiño and Richard N. Villas.
Material type: TextLanguage: English Publication details: Indang, Cavite : Cavite State University- Main Campus, 2001.Description: ix, 81 pages: illustrations ; 28 cmContent type:- text
- unmediated
- volume
- 624.16 P27 2001
- College of Engineering, and Information Technology (CEIT)
Item type | Current library | Collection | Call number | Materials specified | URL | Status | Notes | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
Theses / Manuscripts | Ladislao N. Diwa Memorial Library Theses Section | Non-fiction | 624.16 P27 2001 (Browse shelf(Opens below)) | Link to resource | Room use only | DP-30 | 00000389 |
Browsing Ladislao N. Diwa Memorial Library shelves, Shelving location: Theses Section, Collection: Non-fiction Close shelf browser (Hides shelf browser)
Design Project (BS Civil Engineering) Cavite State University.
Includes bibliographical references.
College of Engineering, and Information Technology (CEIT)
PATINO, REANDRES RODRIGUEZ and VILLAS, RICHARD NUESTRO,
Cavite State University, Indang, Cavite. April 2001. "DESIGN OF A REINFORCED CONCRETE FOOTBRIDGE ACROSS SALUYSOY CREEK 11 AT ENGINEERING COMPLEX". Adviser: Engr. Rico C. Asuncion.
The study on the "Design of a Reinforced Concrete Footbridge Across Saluysoy
Creek Il at Engineering Complex" was conducted at the Cavite State University, Indang, Cavite from September 2000 to March 2001.
The main objective of the study is to provide the University structural plan, details and specification, to conduct structural design and analysis and a detailed cost estimate of the project. The study also aims to develop a scaled model to present the visual outcome of the design.
The study revealed that the variation of loading on the structural member produces section that was different from each other. The total cost of the project was
P153,520.00
Submitted to the University Library 3-27-2001 DP-30