Design of an electrical distribution system for barangay Santa Mercedes Maragondon, Cavite / by Renen N. Eroles and Nathaniel N. Pantoja.

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Indang, Cavite : 2010. Cavite State University- Main Campus,Description: xv, 137 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s): DDC classification:
  • 621.319  Er6 2010
Online resources: Production credits:
  • College of Engineering and Information Technology (CEIT)
Abstract: RENEN N. EROLES and NATHANIEL N. PANTOJA, Design of Electrical Distribution System for Barangay Santa Mercedes, Maragondon Cavite. Undergraduate Design Project. Bachelor of Sciene in Electrical Engineering.Cavite State University, Indang Cavite. April 2010. Adviser: Engr. Efren R. Rocillo. Barangay Santa Mercedes, Maragondon, Cavite, formerly Barangay Patungan, was located near the boundary of Cavite and Nasugbu, Batangas. The total number of population of the Barangay is 1505 and composed of 292 houses. The main source of living n the barangay is from the fishing industries. The barangay is only energized at night time from 6 pm to 10 pm. The power distribution was only connected to a 40 KVA generator set. cond The design of electrical distribution system for Barangay Santa Mercedes was ucted to have a basis for future electrification of the barangay. Having a longer and reliable supply of electricity in the place would make the residents more productive. Having this system the residence will have the privileged to have a cheaper but more efficient of electrical energy The total number of the households that could be serviced by the design if ted is 292. The projected additional of households in the next ten years is 147. The er of the transformers to be installed is 10. The size of primary and secondary to be used is 62500 CM and 250000 CM. The total number of poles to be 1 and the capacity of the substation to be installed for the barangay is 2250 total numb conductors installed is 5 The total load is 330.32 KVA and to be increased by 180.807 KVA in the next ten years. The initial cost in implementing the design is Php. 5,526,029. The total cost of the projected upgrading of the system for the next ten years is Php 2,584,818.99
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Materials specified URL Status Notes Date due Barcode
Theses / Manuscripts Theses / Manuscripts Ladislao N. Diwa Memorial Library Theses Section Non-fiction 621.319 Er6 2010 (Browse shelf(Opens below)) Link to resource Room use only DP-316 00007918

Design Project (BS Electrical Engineering) Cavite State University

Includes bibliographical references.

College of Engineering and Information Technology (CEIT)


RENEN N. EROLES and NATHANIEL N. PANTOJA, Design of Electrical Distribution System for Barangay Santa Mercedes, Maragondon Cavite. Undergraduate Design Project. Bachelor of Sciene in Electrical Engineering.Cavite State University, Indang Cavite. April 2010. Adviser: Engr. Efren R. Rocillo.

Barangay Santa Mercedes, Maragondon, Cavite, formerly Barangay Patungan, was located near the boundary of Cavite and Nasugbu, Batangas. The total number of population of the Barangay is 1505 and composed of 292 houses. The main source of living n the barangay is from the fishing industries. The barangay is only energized at night time
from 6 pm to 10 pm. The power distribution was only connected to a 40 KVA generator set.
cond The design of electrical distribution system for Barangay Santa Mercedes was ucted to have a basis for future electrification of the barangay. Having a longer and reliable supply of electricity in the place would make the residents more productive. Having this system the residence will have the privileged to have a cheaper but more efficient
of electrical energy

The total number of the households that could be serviced by the design if ted is 292. The projected additional of households in the next ten years is 147. The er of the transformers to be installed is 10. The size of primary and secondary to be used is 62500 CM and 250000 CM. The total number of poles to be 1 and the capacity of the substation to be installed for the barangay is 2250 total numb conductors
installed is 5

The total load is 330.32 KVA and to be increased by 180.807 KVA in the next ten years. The initial cost in implementing the design is Php. 5,526,029. The total cost of the projected upgrading of the system for the next ten years is Php 2,584,818.99

Submitted to the University Library 07/12/2010 DP-316