Process improvement on manual molding process at Masa Ecological Development Inc. / by Emmanielyn B. Arriola and Apple Joy N. Molina.
Material type: TextLanguage: English Publication details: Indang, Cavite : 2014. Cavite State University- Main Campus,Description: xv, 110 pages : illustrations ; 28 cmContent type:- text
- unmediated
- volume
- 658.5 Ar6 2014
- College of Engineering and Information Technology (CEIT)
Item type | Current library | Collection | Call number | Materials specified | URL | Status | Notes | Date due | Barcode |
---|---|---|---|---|---|---|---|---|---|
Theses / Manuscripts | Ladislao N. Diwa Memorial Library Theses Section | Non-fiction | 658.5 Ar6 2014 (Browse shelf(Opens below)) | Link to resource | Room use only | T-5309 | 00008767 |
Thesis (BS Industrial Engineering) Cavite State University
Includes bibliographical references.
College of Engineering and Information Technology (CEIT)
ARRIOLA, EMMANIELYN B. and MOLINA, APPLE JOY N., Process Improvement on Manual Molding Process at MASA Ecological Development Inc. Undergraduate Thesis Bachelor of Science in Industrial Engineering. Cavite State University, Indang, Cavite. April, 2014. Adviser Engr. Willie C. Buclatin.
The study was conducted to improve the company process under manual molding section in producing lampshades and frames product. A medium lampshade is composed of seventeen (17) pieces of circular honeycomb while the frame product contains of fourteen (14) pieces of honeycomb panel. The gathered data were analyzed and evaluated through the use of industrial engineering tools in order to create and to improve existing process in producing the lampshade and frame products. Using vacuum machine in making circular honeycomb, 39.30 minutes were needed to produce one unit. Similarly, 47.28 minutes were needed to produce one unit for the honeycomb panel. However, the use of the presser machine in this study would lessen the amount of time spent in producing the units. For the circular honeycomb, only 16.58 minutes were needed and for the honeycomb panel, only 16.49 minutes were used.
The ideal number of worker/s to be assigned to the production line was determined. One operator for circular honeycomb and another operator for honeycomb panel. In terms of profits the circular honeycomb lampshade could gain a profit of P 13,919.00 pesos and P 17,853.92 for frame honeycomb panel. Through the use of cost benefit analysis, it was found out that the company could save by up to P 12,967.50 pesos per month and P 168,577.50 pesos per year.
Submitted copy to the University Library. 04/24/2014 T-5309