Development of pico-hydroelectric power generator at Ba�o de Se�ora Resort in Cavite State University Indang, Cavite / by Marvin C. Maaño.

By: Contributor(s): Material type: TextTextLanguage: English Publication details: Indang, Cavite : 2014. Cavite State University- Main Campus,Description: xiv, 63 pages : illustrations ; 28 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s): DDC classification:
  • 629.254  M11 2014
Online resources: Production credits:
  • College of Engineering and Information Technology (CEIT)
Abstract: MAANO, MARVIN C. and MAGSINO, NIEL ALDRIN A. Development of Pico-hydroelectric Power Generator at Bafto de Senora Resort in Cavite State Univeristy, Indang, Cavite. Undergraduate Design Project. Bachelor of Science in Electrical Engineering, Cavite State University, Indang, Cavite. Adviser: Engr. Ronald P. Pena. The Development of Pico-hydroelectric Power Generator at Ballo de Sefiora Resort in Cavite State Univeristy, Indang, Cavite was conducted to integrate the lessons acquired in the Bachelor of Science in Electrical Engineering program. The study aimed to evaluate the pico-hydroelectric generator in the university; provide the university a reference for the future researchers; evaluate the system in a span of two days; provide an illustration of the behavior of the resulted power output; and compute the project cost. The study covered the provision and construction of the pico-hydroelectric system to be evaluated, which includes one water turbine and gear box unit, one forebay tank, one battery system, one inverter, and a charge controller. The results of the evaluation showed the difference in power output when increasing head measurements. Outputs include the soft and hard copy of the evaluation results, circuit diagrams, and installation manual of the device. The total cost of the study was P 32, 700.00
List(s) this item appears in: Peña, Ronald
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Materials specified URL Status Notes Date due Barcode
Theses / Manuscripts Theses / Manuscripts Ladislao N. Diwa Memorial Library Theses Section Non-fiction 629.254 M11 2014 (Browse shelf(Opens below)) Link to resource Room use only DP-412 00008714

Design Project (BS Electrical Engineering) Cavite State University

Includes bibliographical references.

College of Engineering and Information Technology (CEIT)

MAANO, MARVIN C. and MAGSINO, NIEL ALDRIN A. Development of Pico-hydroelectric Power Generator at Bafto de Senora Resort in Cavite State Univeristy, Indang, Cavite. Undergraduate Design Project. Bachelor of Science in Electrical Engineering, Cavite State University, Indang, Cavite. Adviser: Engr. Ronald P. Pena.

The Development of Pico-hydroelectric Power Generator at Ballo de Sefiora Resort in Cavite State Univeristy, Indang, Cavite was conducted to integrate the lessons acquired in the Bachelor of Science in Electrical Engineering program. The study aimed to evaluate the pico-hydroelectric generator in the university; provide the university a reference for the future researchers; evaluate the system in a span of two days; provide an illustration of the behavior of the resulted power output; and compute the project cost. The study covered the provision and construction of the pico-hydroelectric system to be evaluated, which includes one water turbine and gear box unit, one forebay tank, one battery system, one inverter, and a charge controller.

The results of the evaluation showed the difference in power output when increasing head measurements. Outputs include the soft and hard copy of the evaluation results, circuit diagrams, and installation manual of the device. The total cost of the study was P 32, 700.00

Submitted copy to the University Library. 02/04/2014 DP-412

Copyright © 2023. Cavite State University | Koha 23.05